Works

2026

● Selected Works

○ New European Bauhaus on the Danube

Launch ↗
Description
The New European Bauhaus on the Danube (NEBoD) is a cross-border research initiative exploring the cultural and spatial diversity of the Danube region. As part of its foundation phase, I was commissioned to design and develop its first digital presence — a platform that introduces the network, its people, and its projects, while also establishing a visual identity that balances academic credibility with creative dynamism. Central to the concept is an interactive map that transforms the Danube into both a navigational tool and symbolic framework. Users can explore projects and research activities embedded in specific geographic contexts, creating a spatial narrative that reflects the region’s fluid, hybrid character.
Services
Branding, Design, Craft CMS Development, Custom Map
Client (Freelance)
Stiftung HfG Ulm
NEBoD logo printed on a white sheet lying under shallow, rippling water, with the Danube drawn as a wavy line between the letters
Paper boat folded from a NEBoD-branded sheet floating on dark, sunlit water
Smartphone showing the NEBoD website, lying on a rusty metal grate
NEBoD homepage with an introduction to the initiative next to a satellite view of the Danube
NEBoD about page with a large statement on partnership and collaboration above a photo of the logo
Animated network graph of circles, squares and triangles connected by lines, representing the NEBoD network
Generative layout of green colour blocks crossed by a yellow line tracing the course of the Danube
Interactive map of Central and Southeastern Europe with the Danube highlighted in yellow and project locations marked along it

○ BLANK studios

Launch ↗
Description
Website for a rental photography studio in central Hamburg run by photographer Florian Grill. Designed to support photographers and production teams, the site presents all essential information clearly and efficiently — including the studio’s floor plan, available equipment, booking details, and technical specifications. The goal was to streamline the planning process for potential clients and enable quick bookings.
Services
Design, Next.js Development
Client (Freelance)
BLANK studios / Florian Grill
Isometric line drawing of the BLANK studios floor plan with labelled areas
BLANK studios website section describing the 650 m² studio in large type
BLANK studios equipment list, with the current item highlighted

○ Florian Grill

Launch ↗
Description
Portfolio for Hamburg-based photographer Florian Grill showcasing his works of photography and motion. Built on Payload CMS, the site is statically pre-rendered and leverages virtualization techniques to deliver fast page loads and smooth performance, even when handling high-resolution, image-heavy galleries.
Services
Branding, Website Design, Next.js Development
Client (Freelance)
Florian Grill
Florian Grill homepage with the name in large bold type above a portrait photograph
Scrolling through a grid of close-up beauty portraits on the Florian Grill website
Florian Grill project page showing a grid of editorial portraits
Florian Grill gallery page with two fashion photos of a model in a transparent coat filled with flowers and trinkets
Florian Grill about page listing contact details, studio address, representation and clients

○ Render Studio

Launch ↗
Description
Blickfang is Europe’s largest design shopping event and an international platform showcasing well-crafted products from independent designers. As part of their content marketing strategy, Blickfang provides vendors with branded video materials for social media promotion. To streamline the production of over 140 videos per exhibition, a custom tool was developed to enable employees to render videos on demand. Motion design was initially done in After Effects and then converted into special Lottie files, which are then used by Render Studio.
Services
Motion Design, Next.js Development
Client (Freelance)
Blickfang Designmesse
Render Studio web app in dark mode, listing video formats for Vienna, Zurich and Munich
Rendered advertisement for the Blickfang design fair at Liederhalle Stuttgart

○ Museum of Mistakes (MA Thesis)

Description
The Museum of Mistakes is a virtual exhibition and platform dedicated to rethinking our relationship with failure in the context of design and creativity. Rather than viewing mistakes as costly setbacks, this project explores their potential as vital learning moments and sources of “negative knowledge.” Through interviews, experiments, and research, we examined how error tolerance shapes innovation and how fear of failure often limits creative freedom. The digital experience invites designers to confront and share their own failures, fostering a dialogue that challenges the stigma of mistakes and promotes a more nuanced, constructive view of imperfection in the creative process.
Team
Seda Hancer
3D animation of a classical temple built from wooden toy blocks, with loose blocks scattered around it
Laptop on a black table showing the Museum of Mistakes website
Hands holding a tablet that shows the Museum of Mistakes website with 3D wooden blocks
Three Museum of Mistakes posters hanging from a copper rail with clips
Hands holding an open Museum of Mistakes publication with a photo of a branded pencil
Open Museum of Mistakes publication lying in dramatic light and shadow
Trailer for the Museum of Mistakes website, moving through 3D rooms, exhibits and editorial pages

○ saba

Description
Brand identity for saba, a digital platform offering psychosocial support to individuals with refugee or migration backgrounds. Developed for humanitarian organization IPSO, the app is an interface to speak face-to-face to certified counselors and overcome trauma. A key element of the identity is the audiovisual logo, which includes a calming soundscape designed to reduce anxiety. This subtle, ambient audio is used in the app’s virtual waiting room before video sessions, setting a tone of reassurance and emotional grounding.
Services
Branding, Laravel Development, Sound Design
Client (per webhub)
Ipso gemeinnützige Gesellschaft mbH
Team
webhub, fernao digital
saba logo: a green half-sun made of rounded segments next to the wordmark
Animated saba logo mark appearing segment by segment
Three smartphone screens of the saba app showing onboarding, treatment progress and the first treatment step

○ Jüdische Gemeinde Frankfurt am Main

Launch ↗
Description
Website developed using Craft CMS, based on an existing design. A key feature is a complex color-coding system that visually organizes a wide range of activities and departments. An interactive, self-hosted map provides intuitive spatial access to institutions and locations within the community. The site supports multiple languages, including right-to-left scripts such as Hebrew, and includes calendar and event views in both the Gregorian and Jewish calendar systems.
Services
Craft CMS Development, Custom Map
Client (per webhub)
Jüdische Gemeinde Frankfurt am Main
Team
webhub, CHIVES, NONOT STUDIO
Jüdische Gemeinde Frankfurt website header
Jüdische Gemeinde Frankfurt culture and events page with a concert photo behind the headline
Hebrew version of the Jüdische Gemeinde Frankfurt website with right-to-left text and accordions
Hebrew calendar for July 2025 with Jewish holidays and a list of upcoming events
Interactive map of Frankfurt with blue location pins and clusters for community institutions

○ Physio Bastian

Launch ↗
Description
Sleek landing page for a Rostock-based physio­therapy practice that specializes in neurological and neuro­paediatric treatments. The design builds on the practice’s existing visual identity and features custom-drawn icons as well as a self-hosted interactive map.
Services
Website Design, Craft CMS Development, Custom Map, Custom Icons
Client (per webhub)
Physiotherapie Bastian
Physio Bastian homepage introducing holistic physiotherapy in Rostock next to a large logo mark
Set of white line icons for physiotherapy treatments on an orange background
Physio Bastian services section on neurological and neuropaediatric treatment with a card for physiotherapy for children

○ PowerUp

Launch ↗
Description
Focused on reducing administrative overhead, the app enables users to track time, prepare payroll, and manage day-to-day operations without the need for complex processes or training. A core focus of mine was the development of interactive planning tools, including a project assignment planner and an absence planner, designed to give teams a clear overview of workloads, availability, and scheduling.
Services
Branding, UI/UX, Laravel Development, Website
Team
webhub
White PowerUp logo on a blue background
PowerUp dashboard showing time entries, holiday allowance and company vehicle details
PowerUp weekly timesheet with colour-coded entries for work, travel time and breaks
PowerUp resource planner with an employee timeline above a kanban board of projects

● Information

Niklas Sonnenschein is a designer who likes to code (or a developer with a passion for design, depending on the day.) Currently working remotely as a developer and co-owner at Village One, a cooperative studio dedicated to building a better, more democratic web through engaging digital products and ethical tech.

I believe that thoughtful design, whether visual or software-based, begins with understanding – and that the smallest details often have the biggest impact. I’m particularly drawn to simplifying complex processes and finding smart, digital ways to improve them.

My approach is user-centered, visually clear, and always tailored to the unique needs of each project. My focus areas include interactive and time-based media, as well as typography – because good type is never optional.

In short: I care about how things work, how they look, and how they feel – and I love bringing all three together.

since 2026Web Developer and Co-OwnerVillage One ↗ Remote
2021 ‒ 2026Software Developerwebhub ↗ Remote
2020 ‒ 2021MA Strategische GestaltungHochschule für GestaltungSchwäbisch Gmünd
2019 ‒ 2020Academic Staff, LecturerHochschule für GestaltungSchwäbisch Gmünd
2018 ‒ 2018Visual Design (Internship)Fabrique ↗ Amsterdam
since 2017Freelance Design & Developmentn—sRemote
2015 ‒ 2019BA Kommunikations­gestaltungHochschule für GestaltungSchwäbisch Gmünd
2014 ‒ 2014Presse- und Öffentlichkeit­sarbeit (FSJ)StaatstheaterKassel

● Playground

Audio visualiser: white dots pulsing in an X pattern on a blue background
Shader animation of flowing peach and dark blue bands with a grainy texture
Live view of the Blickfang design fair website with exhibitor booths shown as colourful icons on a floor plan
Animated black silhouette of a man with glowing white eyes on a white background
Line illustration of the Rostock harbour skyline with a ship, crane and moon, framed inside an eye shape
Collage tool arranging cut-out photos of found objects into a face
Slowly shifting purple and orange gradient on black for Soundprojekt
Illustration of six red tomatoes hanging from a dark blue vine
Early-2000s Harry Potter fan club website with a blue frame layout and the Hogwarts crest
Animated illustration of a courier leaning on a cargo bike next to stacked parcels
Museum of Mistakes logo in white on a blurred red and orange gradient
Two phone screens of a party game app with a pink lips logo and buttons to start or join a game
Pixelated, dithered 3D letter S in dark blue on a light blue background
3D model of a fax machine with a coiled handset cord on a dark background
White particle streaks flying across a black background
Onboarding animation of a green clock icon inside a pale green circle
Poster generator web app on a laptop, generating a grid layout for an A3 poster
Close-up of a knitted textile with blue loops over a yellow base
Interview text on a laptop screen where words are progressively blanked out